Leed

Registered for LEED Certification
Year Constructed Under Construction
Project Building Architect Kohn Pederson & Fox in collaboration with Heller Manus Architects
Construction Manager Turner Construction Company
Building Owner Tishman Speyer Fund III
Year Purchased Land closed 2000
Finishes Glass curtain wall with fritted base, protruding glass and metal accent fins
Lobby Materials Stone and wood
Structure Steel frame with concrete over metal decks
Number Of Floors 34 floors of office space, 2 levels of subterranean parking
Rentable Square Footage 555,000
Floor Plate Sizes Low Rise: 20,970 SF
Mid Rise: 17,700 SF
High Rise: 15,800 SF
Floor Load 12.97% - 15.51% (includes floor load and building load)
Floors Above Grade 33
Slab To Slab Height 13'
Floor To Ceiling Height 9'0"
Window Details Full ceiling height with fritted glass apron, state-of-the-art dual-panel insulated glazing units with low-e coating
Column Spacing Generally 25 feet center to center columns
Bay Depths Mid rise typical; ends - 34 feet. Side - 40 feet
Elevators
No. Bank Type Equipment Floors Served Speed
1-4 Low-rise Passenger Gearless traction 1-14 800 fpm
5-8 Mid-rise Passenger Gearless traction 1, 15-24 1000 fpm
9-12 High-rise Passenger Gearless traction 1, 14-34 1200 fpm
13 Service Service Gearless traction Parking, 1-34  
14 Shuttle Passenger Gearless traction Parking, 1  
HVAC Description Each floor of 555 Mission will be served by dedicated self-contained direct expansion air handling units with ventilation cycle capability.
Electrical System Description 555 Mission will be served by a 480/277 volt three-phase four-wire service. The main electrical room is located on the B1 level. Primary distribution is from this room via multiple risers.

Electrical service is provided by Pacific Gas and Electric.

Plumbing Description Pumped domestic water to each restroom with adequate capacity for sewage. Tenant shall the opportunity to tap into the water and sewer riser on each floor for the tenant's use in the premises.
Telecommunications Description AT&T and other service providers will provide telecommunication lines into the building's main telecommunications room. Conduit and riser pathways will be provided from the main room to a common closet on each floor for shared tenant access and use.
Fiber optic System Description AT&T will provide fiber optic service into the building, on a non exclusive basis.
Building Security Description Daytime access to the office tower is monitored at the security station located in the ground floor lobby. The security station is manned 24 hours a day, 365 days per year. After-hours access will be controlled by an access control system connected to card-key devices at entries.

The parking garage will be monitored by strategically located surveillance cameras. The garage is open during regular hours with after-hours access provided by card keys which open the gate.

All stairwell doors are locked on the inside of the stairwell with both lobby and street egress monitored by the security station. Video cameras provide comprehensive surveillance of the entries, main lobby, the loading dock, the bottom of both stairwells, the freight elevator, strategic plaza locations and outside the Mission Street entrance.

Tenant Access Hours 24 hours, 7 days a week
Artwork Plaza to feature a commissioned sculpture by Jonathan Borofsky
Parking 2 levels with 180 car capacity, valet controlled located below grade. Access off Minna Street
Site Description Square shaped level site contained .79 acres or 34,293 square feet located on Mission Street in San Francisco between First and Second Streets
Loading Dock Capacity for three full-size delivery trucks
Contractor / Engineer Turner Construction
Site Area 34,293 square feet
Ceiling Details Donn 1/8" slot reveal with 25' x 2' 5/8" inch Armstrong Dune 1 tegular tile
Restrooms Men's and Women's (with handicap ADA approved access) per floor
Misc Details  
Emergency Backup Emergency power is provided by a diesel generator which can power one elevator at a time in each bank, smoke control, life safety systems and emergency lights for approximately 8 hours. Fuel is stored in a tank to be located on the B1 or B2 level surrounded by a containment wall.
Utilities Description Pacific Gas & Electric
Fire Life Safety Description Both the office tower and the adjacent parking structure will be equipped with fire sprinklers and also contain state-of-the-art life safety systems and meet FM Global standards.